Churchland High School
Portsmouth, Virginia
Since 2017, McPherson Design Group has acted as the Prime consultant for a multi-phased renovation of the mechanical systems for the entire High School. This required an in-place evaluation of the existing structure and reinforcement of the structure to support new equipment in addition to management and coordination of the design team. The design team is currently working on Phase II of this project.
A previous project at Churchland High School included the preparation of contract documents for foundation plans of a 6,000 square foot pre-engineered metal building adjacent to the existing football field. Since there were no mezzanines or loading docks involved in this project, the foundation is a monolithic slab-on-grade with footings.