City Hall Building
Hampton, Virginia
McPherson Design Group, p.c. completed a facility condition assessment of the City Hall building and found problems with the marble exterior of the building. Our office then completed a more extensive Report of the various locations of the cracks and fissures of the marble panels. We also provided contract documents and coordinated the repair of the exterior panels of City Hall. McPherson Design Group also completed an inspection of the window washing attachment that is on the roof of the building to check for deterioration and possible loss of connection to the existing building. We then completed field investigation to determine the locations of additional supports to accommodate the total 10,000 pound maximum load requirement of the Window Washing System and provided contract documents for the design of the necessary repairs of the Window Washing System.